A large OEM Tier 1 and aftermarket manufacturer runs their European Distribution Centre from Redditch, UK. The 24/7 operation needed a complete upgrade to their obsolete lighting systems at the same time as adding in 700 meters of new narrow aisle racking. Ecopare undertook a full lighting audit of the racking, picking, dispatch and receiving areas. The survey data was used to develop the payback models based on a full photometric analysis of the new LED High Bays and emergency lighting. Motion sensors for all the aisle was also included in the project.