The Primary School is part of an academy trust of several schools and they wanted to upgrade their lighting to LED to reduce operational costs and to increase the level of lighting. The school is based on the joining and refurbishment of several regency townhouses to form the school buildings. As part of the project, the original school's architectural fittings were to be retained by retrofitting them to LED based technology.
The project was undertaken over a half term plus 2 additional weekends of effort to ensure that there was minimal impact on the students and staff.
The areas that Ecopare upgraded included: